Odisha Intensifies Drainage Clearance Drive Ahead of Cyclone Akvan
Bhubaneswar, 19 November (H.S.): The Odisha Government has intensified drainage clearance, desilting and congestion-removal operations across vulnerable locations in high-alert districts to prevent flooding and waterlogging amid the forecast heavy
Drainage Clearance Drive Ahead of Cyclone Akvan


Bhubaneswar, 19 November (H.S.): The Odisha Government has intensified drainage clearance, desilting and congestion-removal operations across vulnerable locations in high-alert districts to prevent flooding and waterlogging amid the forecast heavy rainfall associated with Cyclone Akvan.

The Water Resources Department has stepped up preventive measures in districts likely to experience heavy to extremely heavy rainfall, including Ganjam, Gajapati, Kandhamal, Puri, Khordha, Nayagarh, Rayagada, Koraput, Malkangiri, Kalahandi and Boudh.

Field divisions have been directed to clear drainage obstructions, desilt channels, restore major nallas and inspect vulnerable waterways to ensure the smooth discharge of stormwater during intense rainfall.

In Bhubaneswar, congestion clearance work is underway at Gangua Nalla near Atharnalla on the National Highway bypass and other vulnerable locations to improve drainage and prevent waterlogging.

In Ganjam district, the Drainage Division, Berhampur, has intensified inspections and desilting operations following directions from the district administration. Special attention is being given to Sapua Nalla, Bahana Nalla and Surya Nalla, which are critical for stormwater drainage in vulnerable areas.

Teams have removed accumulated silt, garbage, vegetation and other obstructions from identified stretches, while low-lying areas prone to inundation have been identified for close monitoring.

Similar clearance operations are underway at Taptapani Nalla near Phasiguda village under Digapahandi block in Ganjam district to improve water flow and minimise the risk of local flooding.

The department has also strengthened monitoring of rivers, reservoirs, embankments, urban drainage channels and natural stormwater pathways. Emergency manpower, equipment and field resources have been kept ready for rapid deployment in case of any eventuality.

Coordination with district administrations and local authorities is being maintained to ensure timely intervention at vulnerable locations.

The department said the intensified preparedness measures aim to ensure the uninterrupted flow of stormwater, minimise flooding and waterlogging, and safeguard lives and property during Cyclone Akvan.

---------------

Hindusthan Samachar / Monalisa Panda


 rajesh pande